Home MenuWesPac Pittsburg Energy Infrastructure Project
Recent Background:
A Recirculated Draft Environmental Impact Report (Recirculated Draft EIR) was made available for public review/comment between July 23, 2013, and September 13, 2013 (see below for links to download that complete document). Upon close of that public comment period and review of the letters received, the City, as lead agency, determined that additional information would need to be added to the Draft EIR in order to ensure that the environmental analysis is complete and comprehensive. To accomplish this, it was determined that a second recirculation of the DEIR would be required.
In early 2015, the applicant requested a modification to the project description in order to exclude any rail activity associated with the project. Upon review of the new 2015 proposal, staff determined that a second recirculation of the Draft EIR would still be necessary.
Second Recirculated Draft EIR:
A Notice of Preparation (NOP) of a Second Recirculated Draft EIR was released for public review on July 1, 2015. A public scoping session to accept verbal comments on the NOP was held on July 22, 2015, and written comments were accepted through August 7, 2015. Materials related to this NOP process can be found below.
The City is currently working in conjunction with the project consultant on preparation of the Second Recirculated Draft EIR, which will analyze the 2015 modified project proposal and will incorporate/address all comments received during the most recent NOP process.
Contact Us:
If you have any questions please feel free to contact the City using the contact information provided below:
Lead Agency Project Contact:
Hector Rojas, Acting Planning Manager
City of Pittsburg, Planning Division
65 Civic Avenue
Pittsburg, CA 94565
Phone: (925) 252-4043
Email: hrojas@pittsburgca.gov
2013 WesPac Recirculated DEIR Chapters [PDFs]
Cover Page & Table of Contents
- Executive Summary
- Chapter 1. Introduction and Project Goals and Objectives
- Chapter 2. Project Description and Alternatives
- Chapter 3. Aesthetics
- Chapter 4. Air Quality
- Chapter 5. Greenhouse Gas Emissions
- Chapter 6. Aquatic Biology
- Chapter 7. Terrestrial Biology
- Chapter 8. Cultural Resources
- Chapter 9. Geology Soils and Seismicity
- Chapter 10. Hazards
- Chapter 11. Public Services and Utilities
- Chapter 12. Land Use and Recreation
- Chapter 13. Noise and Vibration
- Chapter 14. Population and Housing
- Chapter 15. Land Transportation
- Chapter 16. Marine Transportation and Marine Terminal Operations
- Chapter 17. Water Quality
- Chapter 18. Cumulative Effects
- Chapter 19. Growth Inducing Effects
- Chapter 20. Alternatives Comparison
- Chapter 21. Summary of Significant & Unavoidable Impacts
- Chapter 22. MMRP
- Chapter 23. Consultation and Coordination
- Chapter 24. List of Preparers
- Acronyms & Glossary
Appendices: